Shanghai TAYOR welding machine is applied to the construction of the North Pan River Bridge in Guizh

TAYOR brand NB-KR series gas shielded welding machine and ZD5-1000 submerged arc welding machine, total 38pcs, have been successfully applied to the steel structure welding project of the Guizhou expressway north Pan River Bridge.

The North Pan River Bridge, also known as the "HangRui Expressway North Pan River Bridge", 1,341 meters in length. It is the "world's first high bridge", the main span is 720 meters, the bridge tower is 269 meters high and the bridge surface is 564 meters from the surface of the water.

Follow US
Home     Product      News      Solution      About US